PACKAGES

We offer an wicde range of construction options. Choose from basic to luxury according to your requirements.

Payment Schedule
Advance Payment
15%
Design preparation, site survey, material & contractor blocking.
Brick Work
10%
Construction of brick wall, casting of lintels, chajja.
Plastering & Flooring Work
14%
External / Internal plastering.
Fixing of tiles for bath rooms, Laying of granite or vitrified tilesfor flooring in other areas.
Painting
20%
Painting of internal and external wall with putty works forinternal walls, exterior emulsion painting, all finishing.
Handover
1%
Final handover
Foundation Work
25%
Site Marking, casting of footing, plinth beam, consolidation ofsoil upto plinth level.
Roof CONCRETING
15%
Shuttering and centering for roof slabs, Bar-Bending, Electricalconduit laying and concreting.
Electrical & Plumbing
20%
All Plumbing and Electrical works to be executed.
Wood and railing work
20%
Carpentry works of all doors and windows, Fabrication ofrailings.
TERMS & CONDITIONS
Project Cost
An approximate estimate is given to the customer when a customer makes a booking with us. The actual project cost varies with the super builtup area and finalized architect designs.
Design
Our Architects design with complete Vastu compliance. Our Architects will provide 3 design iterations, two options for massing 3D design and one option for 3D rendering design. Clients may suggest any alterations at the concept phase of design but no alterations will be entertained once the design is freezed and finalized in the scheme phase. Violation of the Architectural drawings if any will be at customer's risk and will hold complete responsibility. The inhouse team of the concern will not advocate any violations on the structure.
Advance Payment
15% of the overall project value will be collected as advance payment. This amount is paid to confirm the booking which will be utilized for the survey, architectural designs, finalising and blocking the vendors / contractors and the materials.
Materials
Types of material may vary as per the final drawings and availability at the time of construction and may subject to change only with consent of the customers. We will ensure that all quality standards are met incase of any changes and the customer gets value for the money invested for the same. The quality engineer will check the quality of the materials at site.
Package Cost
Our standard package rates are also subjected to variations based on the rate of tiles, marble granite, plywood, laminates, plumbing fixtures for interiors etc at the time of construction.
Execution
We will not be liable for any case of dis-intermediation when the customer interacts directly with the vendors / labor contractors on site for the payments, contract details or extra requirements. Any cases reported wherein a customer is found interacting with the vendor or contractors and this is against the interests of our firm, the vendor / contractor would be terminated from the project with immediate effect. We will not entertain third party interactions like outside vendors, consultants or contractors for materials used at the site or structural/design related discussions as per the contract signed with us.
Refund Policy
Booking amount is non refundable as the amount would have already been utilized for designing, survey, freezing vendor and handling charges.
Warranty
Our firm provides a ten-year warranty on structure and underground sump, one- year warranty on seepage on all constructions services and six-month general (i.e. for plumbing, electrical and carpentry) warranty.
Client Scope
Electricity, Bore and water will be charged extra and the customer is accountable for all these related payments and for ensuring timely supply of water and electricity at the site.
TOP